Free Next Working Day Delivery to NI, ROI, UK

Triple Layer 0.18 ReRoof Solution

Triple Layer 0.18 ReRoof Solution

€311,00 Ex. VAT €362,94 Inc. VAT   
€367,63

Key Features

  • 3 Layers of High Performance Multifoil Insulation Materials
  • All products are fully LABC & BDA Certified
  • Can be insulated in 75mm Rafters
  • 2-in-1 Breathable Membrane
  • No risk of condensation
  • No requirement for Rigid PIR Boards
  • Thin, Flexible and Easy to use products

Featured Video

Description

Superior Roof Insulation - 0.18 U-Value

Ecohome Insulation's Exclusive Triple Layer 0.18 ReRoof Solution. Achieve building regulations of 0.18 U-value in 75mm Rafters or deeper, with no Kingspan or Celotex! This Multifoil only system is proven to insulate a roof at less cost, space, and installation time than any other method on the market. Our system includes a double layer of YBS SuperQuilt and a single layer of YBS BreatherQuilt. These materials also have a built-in breather membrane and vapour control layer, reducing the extra materials required. See our useful how-to video, displaying fixing instructions and materials required.

What is included in the 12m² Kit?

Require a kit larger than 72m²? Please call the number above. Alternatively, use our enquiry page or Call Me Back for a call within 1 hour.

EU Delivery Schedule

Republic of Ireland, Northern Ireland and the UK Mainland

 Free Next Working Day Delivery, on all orders over €100 + VAT.

Orders placed prior to 1pm will be dispatched the same day.

Any order placed after this will be dispatched the following working day.

We also offer timely deliveries throughout  Europe – see more details below: 

Belgium, France, Germany, Luxembourg, Netherlands

3 WORKING DAY SERVICE

Austria, Denmark, Switzerland 

 4 WORKING DAY SERVICE

Czech Republic, Hungary, Italy, Poland, Sweden, Slovenia, Slovakia

 5 WORKING DAY SERVICE

Bulgaria, Corsica (France), Estonia, Finland, Latvia, Lithuania, Norway, Portugal (Mainland), Romania, Spain (Mainland)

4-7 WORKING DAY SERVICE

Can’t see your county? Get in Touch for a Quote.

How-To Videos

Triple Layer 0.18 Re-Roof System - By Ecohome Insulation

How-To Guides
How to Insulate Your Roof Without Any Kingspan or Celotex
1. Install first run of BreatherQuilt

Firstly, install YBS BreatherQuilt on the external of the pitched roof. Ensure the reflective foil is facing internally with the Breather membrane facing outwards. Starting at the bottom of the rafters, staple BreatherQuilt to the first rafter using 14mm staples (recommended 300mm intervals). Roll BreatherQuilt horizontally across each rafter, stapling continuously. BreatherQuilt should sag between the rafters as opposed to being pulled taught. Ensure that once the tile battens are installed, there is a clear 10mm gap between the top layer of BreatherQuilt and the tile battens.

2. Install next run(s) of BreatherQuilt

Next, install a further layer of BreatherQuilt, overlapping the product by 100mm and seal using the built in double sided tape. Staple as previously and ensure the tape is secured and sealed. This is to be repeated dependent on how many runs are required for the roof. Additional rolls on the verticals should be butt jointed on the rafters. Ensure the butt jointed rolls are stapled as previous and taped using waterproof tape.

3. Install Tile Battens & Tiles

At the eaves, BreatherQuilt should extend onto a suitable eaves carrier. This works in the same method as standard breather membranes. Proceed next by installing horizontal tile battens, on the top of the BreatherQuilt. Finally, finish by install tiles or slates.

4. Install 2 Layers of SuperQuilt Under Rafter

Both layers of SuperQuilt can now be installed from the internal (underside) of the rafters. The first layer of SuperQuilt is to be recessed in-between the rafters, the 2nd layer of SuperQuilt is to be pulled taught as a flat continuous layer, ensuring that there is a clear cavity between both layers of SuperQuilt and BreatherQuilt.

5. Recess 1st Layer of SuperQuilt

SuperQuilt is stapled to the underside of the first rafter. SuperQuilt is next recessed into the rafter (25mm), and fixed with staples of with battens. The material is then pulled taught and fixed to the opposite rafter. SuperQuilt is then wrapped around the rafter, ensuring stapling regularly, and the procedure starts again. SuperQuilt is overlapped by 50mm, ensure fully tape and seal using Thermaseal Foil Joining Tape over the laps and around the perimeter.

6. Install 2nd Layer of SuperQuilt

Once the first layer of SuperQuilt is installed, proceed by installing the second layer. Staple or nail the second layer through the first layer into the rafters behind. Ensure this layer is also pulled taught, there will then be a cavity between the two layers of SuperQuilt. As per the first layer, the second layer is also overlapped by 50mm. Ensure again the product is fully taped and sealed around the perimeter and overlaps using Thermaseal Foil Joining Tape.

7. Internal Finishing

Once both layers are installed and taped, you are ready for your secondary batten & plasterboard. Start by installing 25mm x 38mm battens on the insulation. We advise to cross-batten, however vertical battens can be used if preferred. Finish by installing 12.5mm Plasterboard. There is no requirement for a Foiled-back plasterboard or VCL. SuperQuilt works as a high performance Vapour Control Layer when taped and sealed using the ThermaSeal Foil Tape.

Have Any Questions?

Our Friendly and Expert Team
are available 7 Days a Week!

Request a Call Back

Unsure What You Need?

View Our Home Insulation
Buyers Guide Below

View Here